According to a notice from the Swiss Railways, due to construction works between the stations Feldkirch and Buchs SG from 13 June to 14 October 2026, a special traffic organization will be introduced for trains 414/464 and 465/415 operating on the Zagreb Main Station – Zurich HB – Zagreb Main Station route:
• On the nights from 13/14 June to 23/24 September, train 414/464 will operate to Feldkirch station via an alternative diversion route through St. Margrethen, St. Gallen, and Winterthur. As a result, the train will arrive at Zurich HB at 11:36 AM.
• On the nights from 14/15 June to 24/25 September, train 465/415 will operate from Zurich HB via an alternative diversion route through the stations Winterthur, St. Gallen, and St. Margrethen. As a result, the train will depart later from Zurich HB at 21:32 PM.
Passengers are kindly requested to check the Swiss Railways website for information on other traffic changes and the organization of replacement transport services, as well as at HZPP ticket offices.
According to a notice from Austrian Federal Railways (ÖBB), due to construction works in the Tauern Tunnel on October 25 and 26, 2026, passengers travelling on train 115 between Bischofshofen and Bad Gastein stations will be transported by bus.
According to information provided by Slovenian and Austrian Railways, due to engineering works at Jesenice station and on railway lines in the ÖBB network, changes will be made to the operation of trains 414 and 415 from September to November 2026. These trains include direct coaches to/from Stuttgart Hbf and Zürich HB.
According to a notice from Slovenian Railways, the following special traffic arrangements will be in effect from September 20 to 25: